“The daily stand up meeting is not another meeting to waste people’s time. It will replace many other meetings giving a net savings several times its own length”XP Rules

One of three things happens at every standup:

  • Issues are omitted.
  • Issues are delayed.
  • Issues are glossed over.

It may be because a developer doesn’t want to look bad in front of their peers. Or, perhaps, they’d rather have the satisfaction of working through the challenge on their own. Regardless, all developers are subject to biases that sway their decision on whether and when they share critical problems.

One person in the room, however, is usually too far from the codebase to recognize all the issues that are at risk of derailing the sprint. And that person–whether it’s a manager, a team lead, or a scrum master–is usually the one responsible for making sure the team stays on track.

This creates an undesirable dynamic. Those who are closest to the problems don’t have the time to step back and see the forest for the trees. The manager, who is responsible for keeping the sprint on track, doesn’t have the visibility to uncover roadblocks and bottlenecks.

Developers end up inadvertently serving as gatekeepers to critical issues.

To change this dynamic, the manager needs to do a bit of research. Before stepping foot into stand-up, they need to understand early warning signs of risks to the sprint.

Identify the signals through the noise

The first thing the manager should look at is: how fast is the team moving? Is this pace faster or slower than normal?

Currently, most managers track some version of Planned vs. Completed work. They might look at story points or tickets closed. While these are useful for assessing planning effectiveness, they’re not diagnostic. You can’t tell whether the issue is with capacity or efficiency.

A more accurate reflection of pace is an activity metric, such as a Pushes or Commit Count. When activity is lower than normal, the manager knows that there are obstacles holding back the engineers from coding.

Standup Meeting Burnup Chart

Code Climate’s insights show a burn-up each sprint based on push volume.

If this activity count is low, the manager will want to further investigate where developers might be stuck. They should look out for three red flags:

  • Long-running pull requests: Are there pull requests that have been open for more than three business days? If so, who can help get it out the door, or break it up into smaller chunks?
  • High review cycles: Is there a pull request that has been passed back and forth between the reviewer and the author several times?
  • Large pull requests: Are contributors opening pull requests in small, easy-to-review units? If not, those pull requests are harder to review and at greater risk of causing an issue when they are merged.
Work in Progress

Code Climate's insights show work in progress with activity level, age, and health. See at-a-glance the pull requests that are most likely to impede your team.

If pace is slow, yet no pull request is growing unwieldy, you’ll want to pull a list of engineering activities. Check tickets, commits, merges, and reviews to ensure that the team’s work aligns with what was planned and expected.

Activity Log

Activity Log represent every engineering activity with a shape. Hover over to get context on what a team member is working on.

You can surface this information by setting up a Git history statistics tool, like GitStats, and then pull the data before each standup. Or, you can use a Software Engineering Intelligence (SEI) solution like Code Climate to see all of these risks in one place.

Regardless of how you pull the data, spending fifteen minutes to catch up on all the important work in progress ensures that no time is wasted catching up during actual standup.

Shift the conversation toward action

With more shared context, the conversation shifts from talking about problems to talking about solutions. Here are two scenarios played out side by side:

What did you do yesterday?

Dev: Yesterday, I worked on the Activity Log feature. I’m almost done, should be good to ship Friday.Engineering Manager:Great! Anything, in particular, that’s giving you trouble?Dev: Nope.

Dev: Yesterday, I worked on the Activity Log feature. I’m almost done, should be good to ship Friday.Engineering Manager: I saw that you and Dev2 were going back and forth during the code review about how to implement that. It made me realize we haven’t spent enough time talking about the architecture. Let’s grab a whiteboard after standup, and get on the same page.Dev: Yes, that’d be great.

What are you working on today?

Dev: Today, I’m finishing up the Health Check feature. Dev2 had been working on it all week, but they passed it on to me before taking their vacation. Should have everything I need.Engineering Manager:Great, let me know if there’s anything you’re missing.

Dev: Today, I’m finishing up the Health Check feature. Dev2 had been working on it all week, but he passed it on to me before taking their vacation. Should have everything I need.Engineering Manager: I saw that you’re also helping the PM with the feature he’s getting ready to put to design. Let’s touch base about how to fold both of these things into planning.

Anything blocking you?

Dev: Nope.

Dev: Nope.Engineering Manager: I saw that you’ve been working on a PR for a couple of days now. If you’re still having trouble with it, pair with Dev2 to see if you can ship that in a smaller increment.Dev: Sounds great, thanks!

The opportunity to offer support is much greater when you start the conversation with actual data. It takes the onus off of each developer to ask for help and transforms the meeting into a constructive way to keep the team on pace.

Standup is not roll-call

The value in disrupting developers for face-time is to identify and plan for addressing bottlenecks– not for proving that they’re working.

Once time is re-allocated toward identifying risks and ensuring the team is on track to hit this sprint’s goals, you’ll find that finally, the stand-up is providing more value than a meeting that is several times its length.

All that’s required is a bit of preparation.

Your engineering team is a lean, mean, feature-shipping machine. You have a happy and growing customer base. You’re taking customer requests but have a clear product direction. Things are hectic, but good hectic.

Then, the execs decide it’s time to scale. They’re asking your team to increase output by 20%, 50%, 2x, or 10x. And they give a budget of $x to do so.

Most engineering managers put that cash straight into recruiting and hiring. Their team has worked so hard to get this far, so instead of trying to push them to do more in less time, they’re going to double their output by doubling their headcount.

Managers who have experienced scale, however, are wary that growing a team can have diminishing marginal returns. They also know that the processes of their 7-person team aren’t going to work for a 20-person team or a 200-person team. The legwork to prepare for scale is significant so the decisions should be made carefully.

To help you make a well-calculated decision, we put together a cost-benefit analysis of scaling an engineering team, equipped with a spreadsheet Hire Or Optimize Calculator.

The hidden costs of hiring

When you’re working on an agile team, it always feels like you’re just one person short from getting everything done. It’s tempting to take advantage of the opportunity to bring on just one or two more folks to hit a 20% increase in output.

But just like every line of code adds technical debt, every butt-in-seat adds logistical complexity to your team. At the heart of the inefficiencies of scale is the non-linear growth of communication lines:

Costs of Hiring

The complexity of the relationships between individuals grows exponentially with each added team member, which makes it harder for managers to:

  • Communicate decisions to team members
  • Give team members a voice or input into said decisions
  • Execute on a process change (more on this later!)
  • Gauge the effectiveness of said process change

Two-way communication between leaders and direct reports is integral to maintain alignment on the team and ensure people feel invested in the work. Without it, you’ll run into expensive problems like burnout, high turnover rate, and slow/inefficient incident recovery.

The measures typically introduced to adjust for scale usually take time away from actual engineering:

  • More team meetings that ensure employees understand how their work fits into the larger picture (+30 min/week)
  • More 1:1s that ensure employees get face time and opportunity for input with decision makers (+30 min/week)
  • More documentation that ensures that information doesn’t get siloed with one person or team members (+15 min/week)
  • More reporting that ensures that new changes are being implemented without direct supervision (+15 min/week)

If you added these processes overnight at an inflection point of hiring your 31st engineer, that’s 45 engineering hours lost a week– a loss that’s greater than the return you’re getting from a fully-onboarded engineer. This effect is often described by Brook’s Law: that adding manpower to a late software project will delay it.

Calculate your own cost of hiring

We built a model for you to estimate the costs and benefits associated with engineering hiring over time. Note that we made some simplifications, but as the saying goes, “all models are wrong, but some models are useful.”

The information you’ll need is:

  • The # of engineers you’re looking to hire
  • The # of engineering managers you’re looking to hire
  • The average engineer salary at your organization
  • The average manager salary

Inputting our own data, the monthly costs look something like this:

Monthly Results of Hiring

Our “Hire” Results

While the benefit does, in fact, outweigh the cost, we’re looking at a 36% cost increase for a 26% productivity increase. Over time, here are the cumulative results we’d be looking at:

Cumulative Results of Hiring Graph

Our Cumulative “Hire” Results

Before committing to such a hefty, upfront cost, consider making your existing processes as lean as possible first. For most managers, this opportunity is much greater than they realize.

Hidden cost of process optimization

There are two common misconceptions about process optimizations:

  • That there are few associated costs, and
  • Benefits are minimal, often to the point of being trivial

Neither is necessarily true.

Let’s say a manager joins an engineering team and is horrified to find barely any processes in place ensuring continuous delivery. The team calls itself agile, but in reality, everyone is working on an undefined number of projects, and almost no one sticks to the deadlines discussed during planning meetings. The manager might try to force a new structure, equipped with retros, burn down charts, and a more-structured code review process.

All of those changes are good in theory, but making them all at once will drastically affect performance, as team members adjust to the new constraints. If productivity stalls for too long, a manager might pull the plug on the whole overhaul, and get back to their disorganized, but frequent shipping schedule.

Costs of Process Optimization

source

Big process changes require a re-onboarding of every existing team member, each of whom has already found and developed a working process that they believe to be efficient. You can expect your team to dip below its previous productivity level for anywhere from 3-12 months before seeing the effects of those changes.

To mitigate the risk associated with the process change, you can minimize the scope of each change. This “agile” approach to change management ensures that the workflow changes for your team members remain minimal and gives you the ability to roll back anything that isn’t effective without incurring too much loss.

Costs of Process Optimization

source

This kind of process optimization can also lead to much more than marginal returns. Just like adding a couple of meetings a week can subtract the equivalence of the productivity of a full-time engineer, the reverse is also true.

If you make small optimizations for each team member, it can boost output significantly. A change that improves the individual output of each developer by just 1%, means a team of 10 will be working 185% faster by the end of just one year.

Calculate your own cost of optimization

Use the same model as above to see the relative costs and benefits from an optimization.

When our engineering department restructured our teams into smaller squads earlier this year, we were aiming for a 20% productivity increase. Here are the kind of costs and benefits we were projecting per month from this optimization:

Monthly Results

Our “Optimize” Results

Cumulatively, the gains quickly and drastically outpace the costs:

Cumulative Results of Optimizing

Our Cumulative “Optimize” Results

While hiring means our monthly costs increased 36% for a 25% ongoing increase, here, our monthly costs increase 3% for a 20% ongoing productivity increase. These relative costs illustrate that it is always better to look for opportunities for optimization before hiring.

Engineering processes are invisible, so uncovering opportunities for improvement is rather difficult. This requires quantifying how fast your team is moving and learning the patterns of where work gets stuck along the pipeline.

A Software Engineering Intelligence (SEI) solution like Code Climate can help you understand speed and work habits at a glance, or you can track simple metrics, such as Pull Requests Merged or Commit Volume yourself.

Optimize or hire?

Whether it’s better to (a)optimize or (b)optimize and then hire, depends on your desired outcome. You probably can’t 10x your output by optimizing alone, but before hiring, make sure you’ve taken every advantage of optimization that you can. As your team grows, any process improvement will become more lengthy and expensive.

Schedule a consultation to learn how to maximize engineering impact.

An introduction to Data-Driven Engineering

Welcome to the first installment of Code Climate’s new “Data-Driven Engineering” series. Since 2011, we’ve been helping thousands of engineering organizations unlock their full potential. Recently, we’ve been distilling that work into one unified theme: Data-Driven Engineering.

What’s Data-Driven Engineering?

Data-Driven Engineering applies quantitative data to improve processes, teams, and code. Importantly, Data-Driven Engineering is not:

  • Ignoring qualitative data you don’t agree with
  • Replacing collaboration and conversations
  • Stack ranking or micromanaging developers

Why is this important?

Data-Driven Engineering offers significant advantages compared to narrative-driven approaches. It allows you to get a full picture of your engineering process, receive actionable feedback in real-time, and identify opportunities for improvement through benchmarking. Most importantly, quantitative data helps illuminate cognitive biases, of which there are many.

What can Data-Driven Engineering tell us?

After analyzing our anonymized, aggregated data set including thousands of engineering organizations, the short answer is: a lot.

Over the coming weeks, we’ll explore unique and practical insights to help you transform your organization. We’ll share industry benchmarks for critical engineering velocity drivers to help our readers identify process improvement opportunities. Here’s an example:

Pull requests merged per week (PR throughput) per contributor1

This plot shows that an average engineer merges 3.6 pull requests per week, and a throughput above 5.2 PRs merged per week is in the upper quartile of our industry benchmark.

You might be thinking, “Why do some engineers merge almost 50% more than their peers?”… and that’s exactly the type of questions Data-Driven Engineering can help answer.

1 We included contributors who average 3+ coding days per week from commit timestamps.

We sat down with Jake Hiller, Head of Engineering at Codecademy, to find out how they use Code Climate’s  automated code review tool, Quality, to maintain their quality standards while rapidly growing their engineering team.

INDUSTRY Education

EMPLOYEES 50+

DEVELOPERS 20+

LOCATION Manhattan, NY

LANGUAGES Ruby, JavaScript, SCSS

CUSTOMER Since May 2013

"Code Climate keeps our process for creating PRs really low-effort so we can quickly test ideas and ship sooner."

Why Code Climate Quality

Like many rapidly developing teams, Codecademy was running into growing pains for both engineering onboarding and code review. They had tried using local analysis tools but found them cumbersome to integrate as development environments varied across the team.

With an engineering workflow centered around pull request reviews, and a desire to reduce friction in committing and testing code, they needed a solution that would optimize their pull request review process and enable new team members to quickly become productive.

Codecademy had been using Quality for their Ruby stack since 2013. When Head of Engineering, Jake Hiller, joined in early 2015, he saw an opportunity to alleviate their code review and onboarding issues by rolling it out to the whole team.

“We wanted to avoid anything that blocks engineers from committing and testing code. Other solutions that use pre-commit hooks are invasive to both experimentation and the creative process. Code Climate’s flexibility helps us maintain rules that are tailored to our team and codebase, while offering standard maintainability measurements. Plus it enables us to defer checks until code is ready to be reviewed, so we can quickly test ideas and ship sooner.”

“Code Climate helps us transfer knowledge to new engineers – like our coding standards, why we’ve made decisions over time, and why we’ve chosen certain structures and patterns."

Increased speed and quality

Since rolling out to the whole team, Hiller says Codecademy has seen an improvement in the quality of their code reviews and the ease with which new team members get up to speed.

“Code Climate helps us transfer knowledge to new engineers – like our coding standards, why we’ve made decisions over time, and why we’ve chosen certain structures and patterns. New engineers can look through the Code Climate issues in their PR, ask questions, and propose changes and suggestions to the team.

“It’s also increased the speed and quality of our pull request reviews. We’ve been able to spend more time discussing the important functional aspects of our code, and less time debating smaller issues. There are a lot of issues that can’t be fixed with an auto formatter, which is where Code Climate will always be really helpful for our team.”

About Codecademy

Codecademy was founded in 2011 as an immersive online platform for learning to code in a fun, interactive, and accessible way. They’ve helped 45 million people learn how to code, covering a wide variety of programming languages, frameworks, and larger topics like Data Analysis and Web Development. Their recently released Pro and Pro Intensive products provide users with more hands on support and practice material to help them learn the skills they need to find jobs.

In July, we hosted the first annual Code Climate Summit, a one-day conference for leaders of engineering organizations who want to better themselves, their processes, and their teams.

Today we’re sharing The Role of being Technical in Technical Leadership, by Camille Fournier, Managing Director at Two Sigma.

Transcript of talk

Camille Fournier: Hi everyone, I am excited to be here at this Code Climate Summit. We were customers of Code Climate when I was at Rent the Runway, so I’m a huge fan of the product and I was very honored to be invited to come speak.

This is a talk about engineering management, which I think is pretty important for building effective engineering teams and building good products. We’re going to talk about what actually what it means to put the engineer in engineering management.

Before I begin, of course, I must give a pitch to Two Sigma, so I am as of about four months ago, the head of platform engineering at Two Sigma. Two Sigma is a financial company here in New York. Our engineers and modelers harness data at tremendous skill, use machine learning, distributed computing, and other technologies to build powerful predictive models. If you are interested in that world, twosigma.com/careers, check it out.

Okay. So. Let’s get this really started. “You either die an engineer or live long enough to see yourself become the business person.” This something my friend Cliff Moon at some point said or tweeted, probably both, and I like this quote not just because it’s kind of funny, but also because I think it really summarizes the struggle that many people have when they think about engineering management. “Am I still an engineer, or have I suddenly become a business person?”

I personally have struggled with this, so this is how I have a lot of empathy with this. I started out my career as a hands-on engineer, I guess as most people do. I was hands-on for a really long time, building lots of different kinds of systems, mostly distributed systems.

I actually just got photographed for something called Faces of Open Source, it’s facesofopensource.com, which is taking pictures of various people in the open source community. It was a cool experience and this is the photo that came out of that.

So, I’ve spent a long time as a hands-on engineer. At some point in my career I was like, “Oh, I want to do more, I want more power, I want more authority.” Lots of bad reasons, but I decided that I wanted to go into management, so I joined a startup as a director of engineering, and I was still actually writing a lot of code for the first year or so I was there.

As the startup grew – and that startup was, of course, Rent the Runway – as that startup grew and was successful, and I was fortunate to be growing and be successful along with it, I hit that dreaded cliff of no more coding, where I really had to stop coding.

We tell managers that this will happen. Sometimes we tell them a little too early in my opinion. I actually think it’s okay for you to write some code when you have a small team, but there is certainly a point where if you are writing code as a manager, you’re probably avoiding doing more important work, like talking to people, and planning things, and other kinds of things that make teams successful.

It’s still hard. It’s really hard if you’ve been a programmer for a long time, if you’ve been a hands-on person for a long time, hitting that cliff of no coding is really painful. I remember, it probably took me like a year of angst before I finally got over it.

We say a lot of things about management, we call it a career change and now that you’re a manager, you’re no longer an engineer anymore. I have probably said this myself, and while I think it’s kind of true, I also really love the language that we use when we say this, because it’s also kind of a negative way to frame things.

I wrote a book and you all have copies of it, which is cool. I’m very flattered that they decided to give my book as a giveaway here. This book is about being an engineering manager. It’s about the various stages of engineering management.

Part of the reason that I wrote this book was that I felt that there was not a lot out there that really walked the path of being all the way from a mentor and early career leader, but definitely still a hands-on engineer, all the way through to being something like a CTO or a VP of engineering or a senior executive.

I also wrote this book because I have a thesis that is, among other things, while the people side of management is really important, managers also need to be technical. I think that there is a reason that we tend to promote technical people into management roles. It’s not just because we want to punish them.

Engineering management is the intersection of engineering and management.


It’s that, engineering management is the intersection of engineering and management. It is not just managing a bunch of people who happen to be engineers. It is important that you, to be a really successful engineering manager, understand the way that people do their work. You are able to guide their technical decisions.

This doesn’t mean you’re making decisions for them. In fact, most of the time, I don’t really make all that many decisions. I try to ask good questions and guide my teams, but I’m not actually making decisions for them. The hands-on people who are doing the work are making the decisions, but I still need to understand the context in which they are operating. That context includes what it is like to be an engineer.

This talk is going to cover three traits that I believe are overlapping traits that you tend to find in great senior engineers, and the way that these traits translate into what makes good engineering managers. I’m going to talk about debugging, I’m going to talk about empathy, and I’m going to talk about judgment.

Debugging

Let’s start with debugging. I love debugging. I don’t know about all of you, I’m sure some of you do and some of you don’t. It’s definitely not the thing that every single engineer loves to do, but it’s something we all have to do because

I’m sure you’ve probably forgot a semi-colon the first time you wrote hello world.

We’re always debugging all the time. Things are always breaking and you’re always having to debug, and as you become more and more of a senior engineer, you experience more, new, interesting ways that things can fail. You start to sense the vast possibility of causes behind failures.

Part of the reason that I went into management is actually the same reason that I love debugging. I wanted to understand why things were happening. I started asking why a lot. Why is this happening? Why are we doing this? Why do we do this process this way? Why didn’t we fix this? Why didn’t we make this choice? Why, why, why, why?

Asking why too much, it turns out, is a not uncommon way that people end up becoming managers, because they want to know. They want to know not just about what is causing systems to behave in a certain way, but they also want to know what’s causing us to make decisions this way in the first place.

At the end of the day, this skill set overlap is what a lot of people call “systems thinking”. It’s not my favorite term, but I like the concept. People that are good at seeing the interactions of different kinds of systems that you may not have perfect information into. When you’re talking about looking at the interactions of people, you can’t read people’s minds. You can only go by what they tell you.

You don’t always have perfect insight even into the software systems you’re developing. People who are good at seeing in systems, are good at debugging, and they tend to become good managers for the same reason, because, guess what, as a distributed systems engineer, the system is slow, it’s probably the hardest problem you’ll ever have to debug, and as a manager, the team is slow.

“The team is slow” is the hardest problem you’ll ever debug.

It’s probably the hardest thing you’ll ever need to debug, especially if you happen to be working at a startup for a CEO, especially if the CEO is not technical. But e*ven if the CEO is technical, frankly, they always want to know, “Why aren’t we getting it done faster. Why aren’t we moving faster. Why isn’t this release done? Why haven’t we finished this?”

To figure this out, you have to look across a bunch of different elements. You have to look at the people, sometimes as humans, we move slowly because people are unmotivated for whatever reason. They’re burned out, they’re tired. They don’t get along. The team hasn’t actually gelled all that well. You’ve got somebody that’s very disruptive. They just can’t agree on the way to do something.

Sometimes, of course, the challenge is a process problem. You’ve got this product management team that thinks that they’re mini demi-gods over here, throwing work over the wall to the engineering team and saying, “Behold my brilliance, go implement it.” And most engineering teams don’t really like that, it can be very demotivating, although some of them do. You’ve got to understand what process, what’s the process contributing to the team’s slowness.

And of course, sometimes it’s the systems. Sometimes you really are dealing with really hairy, nasty technical problems that are going to take a long time to figure out. They’re going to take a long time to solve.

You as an engineering manager, have moved beyond the world where you’re thinking about the interactions of software systems all the time, but you’re still looking at system interactions. You’re looking at the interactions of the systems of the humans and the processes that the humans are using and the technology that they’re having to deal with to get their job done every day.

Empathy

The second characteristic is empathy. We talk about empathy a lot. It was already spoken of quite a bit in the last talk. I think it’s a very popular thing to talk about in technical circles these days, which is probably pretty good, because for a long time we had this very robotic approach to technology. Programmers want to go and close the door and be in silence and just thinking about computers. We do realize that to really build effective products, we need to care about our customers and to build effective teams, we need to care about our teammates, and as a manager, we want people who appreciate people. But, there’s a little more to it than that.

There was a study done recently that showed that the number one contributor to workplace happiness that they measured, was actually whether or not they believed their boss was highly competent. Highly competent could mean a few different things. Highly competent could mean the boss could do your job, but highly competent could also mean a domain expert in the field.

It’s very clear though, that people really do want highly competent bosses, and frankly I feel the same way. I get to work for this guy, his name is Alfred Spector, he is the CTO at Two Sigma. He was a professor of computer science for a long time, actually started a company, then became a lead scientist at IBM. He ran Google Research for a very long time before coming to Two Sigma. He’s a very interesting person. He has a really incredible technical computer science background, he’s a good manager, which is amazing, and he’s entrepreneurial. All of those things are awesome, and I’m really excited to get to work for someone like that. I want to work for someone that I believe is highly competent and has shown a track record of doing great things.

That doesn’t mean that I expect him to sit down next to me and pair program. That actually doesn’t mean that you as a manager are going to be spending all of your time actually in the weeds of the technology, coding with your team.

So what does it really mean to say that we want someone who possesses technical empathy? What does this empathy element mean for managers beyond just, you can see how people are feeling?

I think it really means that you want someone who appreciates the work, someone who appreciates the details of the work and why work is good or bad. Your manager is often the person who evaluates you, who is evaluating your work and saying who’s doing well and who’s not doing well, maybe even who’s going to get promoted. You want that person to actually be able to tell the difference between somebody who does high quality work and someone who doesn’t.

You also just want that feeling of the expert appreciation. It means more when you respect someone’s opinion that they have a high opinion of you. We want someone who really appreciates why our work is hard, why our work is done well, maybe even, sometimes is able to give us suggestions about how to do it better. But certainly, we at least want that appreciation.

It’s also good as a manager, to be able to appreciate what your teams are going to be excited about. Different people are excited about different things, but engineering teams tend to get excited about slightly different kinds of problems than marketing teams or sales teams. Engineering is a special discipline with its own rules, with its own challenges and we want managers who can appreciate and identify interesting problems and direct us towards those interesting problems and make us feel like they understand what the wider tech world is excited about and can actually help us get to do some of those exciting things. Even more importantly of course, we want managers who appreciate what frustrates engineers. It’s not obvious to a non-engineer, what parts of the job are stressful. It just isn’t. It’s very hard to understand how stressful it is to get distracted or pulled away from your code every 15 minutes because somebody keeps coming over to talk to you over your shoulder.

That can be a hard thing for people to understand. It’s much easier with a technical manager, at least someone who appreciates what the work is like, to be able to predict those frustrations and therefore cut them off before they start happening.

Technical Judgment

Last but not least, there’s the matter of technical judgment, which is of course, very important in senior engineers. I said before that technical management is often the art of guiding technical decision making. It’s not making the decisions yourself, but even when you have a very strong tech lead or architect or whatever and a great product manager, what you will often find as an engineering manager is that you are the person sitting in the middle of those two and trying to balance those differing viewpoints.

You need to make sure that you are actually taking into account the full context of both the technical and the business side in order to help the team prioritize their work. Because ultimately, the technical decisions that are made will impact the effectiveness of the team, and the effectiveness of the team as a manager is definitely your job.

A lot of the people in their first go round of engineering management try to apply just the process to things. They say, “Oh, I know the process that will solve it.” It can be anything from we’re going to do OKRs, we’re going to have engineers vote on whatever project they want to work on, we’re going to do agile, scrum, kanban, whatever style project management you want to do.

I actually think process is useful and different processes work well for different teams, but there’s a lot of nuance. You have to understand what process is going to work for your team. Moreover, you’ve got to remember that process does not make decisions for you. The best thing process does is provide the context, again, all of the information at your fingertips with the right people in the room, to help you make decisions.

One quote I use in my book is that a good political idea is one that works well in half-baked form, which I believe is from some kind of economics blog. I believe the same is true for a process. Good processes are going to work well in half-baked form. As an engineering manager, you’ve got to understand how to get something that works well for your team, but it’s not going to be the magical decider of all your difficult technical decisions.

Good senior engineers and good engineering managers have a good eye for detail. They can be detail oriented when they need to be, because ultimately, building good software systems is all about the details. It’s all about understanding the details of the problem you’re solving and accounting for those details.

The same is true for making good decisions. Good decision making is all about having the taste and understanding the nuance that makes two decisions that seem about equivalent actually different, and one the right way to go, and one the wrong way to go.

I talked about prioritizing. I’m going to reaffirm that point. You’re at the end of the process, you’re trying to get something shipped. Prioritizing, prioritizing, prioritizing, is the name of the game and good engineering managers are good at being in that end stage and looking at the list of technical features and looking at the list of product features and asking both sides what’s really important here.

“What technical features can we absolutely not ship without. It would be bad for us to ship without having any kind of alerting on this, because this is actually pretty mission critical. But you know what? Actually, this is just an MVP and it’s going out to five people, so maybe we can just ship it without that feature.”

On the product side of course, it’s like, “Hey, product team, I know you love all these features, but which of these do you love the most, because guess what, this beautiful widget that you want the engineering team to build, we’ve talked it over and this is going to be a three week project to get right. Does this really have to be in the critical path of delivery?”

Being able to balance those two concerns and advocate for each side is one of the important characteristics of good engineering management.

Last point here, you have to understand the problems that the team is solving well enough to be able to communicate them with various people.

Manager telephone. Manager telephone happens when your manager goes and sits in a meeting, takes a bunch of notes, comes back to the team, asks the questions they have written down on their sheet that were the questions that were asked in the meeting, writes down your responses, goes back to the other team, reads those responses out and so forth. Zero value add. You want managers who can understand at least well enough to focus and reframe the questions that are being asked from people who aren’t familiar with the work of the team and who are good at actually getting the right information out of the engineering team, and making sense of it.

Nobody wants managers who are going to play telephone. That’s simply a zero value add activity. We want people who are going to appreciate the work that’s going on well enough to actually focus the discussions around it.

Debugging, empathy and judgment. These are pretty important. I think these are important skills to build whether you decide to become a manager or whether you simply want to be a really great hands-on engineer. What else?.

There is a little bit of a risk to this whole “rah rah managers should be technical” and that risk is that you get managers who were once pretty good at being technical, but who have gone hands-off for a long time and lost their touch a little bit. They still think of themselves as really amazing, as one of the people, as it were, but they don’t really remember what it’s like, and frankly, they haven’t even kept up, so they don’t really know what it’s like to write code in JavaScript. They’ve only ever written code in C++, and frankly, that’s just a different world, right? Writing code for the browser’s super different. They have not kept up. They don’t really appreciate what the actual work looks and feels like.

Stay humble.

If you decide to go on this path, it’s very important that you stay humble with your knowledge and your understanding. You can glue this in a bunch of different ways. Some people advocate for going back and forth between big companies and small companies where you can be a manager and then you can be hands-on and that’s an awesome path to take.

Some ways you could do it – frankly, I sometimes write a little bit of code. I work on a lot of open source projects, but realistically, you can keep reading code, you can keep helping debugging. You’re going to get a little hands-off, though.

My advice if you decide to follow this path is to, if nothing else, keep learning, particularly about advances in the way software engineers do their work. That’s things like, “What does it mean to build all your software based on cloud services.”

That’s very different than building everything in house. What does it mean to do a continuous deployment process? What are the major advances in the way people actually do work and deliver software? That’s a really important thing for you to keep in touch with as an engineering manager if you’re managing software engineering.

Okay, so these traits, one more time. Debugging, seeing those symptoms, technical empathy, that technical appreciation, and finally judgment, prioritizing and understanding the problems at hand.

I still consider myself an engineer, even though I don’t write code all that often. I personally hope to die an engineer someday, but whichever of those two paths I end up following, I know that it’s going to require constant learning, constant reading.

You can be like this guy. He used to work for Code Climate and he is the quintessential renaissance man who manages to both be the business jerk and be an engineer, all in one. So read more. You can start with my book, because you all have a copy of it, and thank you all very much. I’m happy to take questions.

Audience 1: Thank you for the talk, it’s great. Disclaimer, I’m not an engineer, I’m a product manager. My question to you as the technology industry veteran that you are today, you see these four engineers that either goes into principal engineers or technical fellow or going to director of engineering, do you see the same trend with product management? Do you have any advice for managers of product manager?

Camille Fournier: Not as much, mostly because the product teams tend to be so small that even as a manager of product managers, you’re not usually managing a lot of people. There’s just a huge difference between … frankly, I think you can be an “individual contributor style” engineer and still manage three or four people, particularly if they’re very senior and they don’t require a lot of mentorship or management.

I think that often product management, because there are just not that many people to be managed, it’s not as much of a fork. I do think that what you see happen with product management is that product managers who become more senior or experienced, tend to be like general managers – perhaps of business lines – and that is a bigger, more complex management job.

I could imagine that for product managers there is a little bit of a split between, I’m going to go be a general manager for a pretty big company and run a large business line and actually have a lot of management accountability or I’m going to stay very focused on just product direction and strategy.

Audience 2: Great talk, thank you so much. In your experience, what is a good management to engineer in ratio, so how many engineers per engineering manager do you think is a right mix. I know it’s different for every company and every field and all that, but just in general.

Camille Fournier: Okay. I do think it’s very hard to effectively be a one-on-one manager for more than eight to ten people. If you’ve got a team of more than ten people directly reporting to you, and frankly for many people it’s less than that, you are probably not serving very well, some of those people.

I know personally that if I have more than about six direct reports, at some point, people are getting less of me than they otherwise might. That helps sort of think about the ratios. I do still believe that you can effectively be managing a small team and acting as an individual contributor. You’re not going to be 100% as effective as you would be if you had no team. You can tweak ratios that way, but I certainly don’t think that it’s a good ratio to have one manager per 20 employees. It’s probably not a good ratio to have one manager per two employees either. It’s going to be somewhere in that.

I would say probably one to six, one to eight is okay, especially if the line managers are still expected to stay fairly technical even if they’re not writing a lot of code there, they’re really thinking about a lot of technical issues.

Audience 3: Hi. You said that team effectiveness is a manager’s primary responsibility or one of them. What are the KPI’s that you use to determine your team’s effectiveness?

Camille Fournier: Okay. A few KPIs that I would see, obviously, retention. Are people quitting? That’s a big one. How are we doing on the deliveries that we’ve committed to? If we’ve committed to deliver certain software or hit certain goals, how effective are we at hitting those goals and are those goals stretch goals? Do we think they’re not the level we would like them to be?

I think overall morale of a team is just generally important, so even if people aren’t quitting, you can still find yourself in a situation where people aren’t quitting, but they’re just not that excited about work. They’re not that engaged and enthusiastic. A lot of team effectiveness, the output is what work gets done, but the side pieces of it are really a lot about morale and retention and engagement from the team.

Audience 4: You talked about show an appreciation for team members. Have you ever been in a situation where you show appreciation of a team member and it’s fostered envy from other members or there’s been resentment as a result?

Camille Fournier: Yeah, absolutely. I think was accused of playing favorites at some point in my career, so I’ve tried to be very aware of that. I think appreciation is one of those core management things that you want to try to do a lot for everyone. It actually is not a bad thing to tell people they’re doing a good job fairly regularly and try to tell everyone on the team.

The way you recognize people, particularly if you do public recognition, you’re definitely shaping your culture when you do that. If you always publicly recognize individuals, and you never publicly recognize teams, your company is going to start to develop a culture of “individual accomplishments are the most important thing and it’s better for me to get the win myself than to bring the whole team along.”

You have to be very careful with thinking about how you recognize those things. Honestly, I think a lot of this appreciation is just in that one on one. Do I feel like my boss really understands the work I’m doing well enough to be like, “Wow, that was a hard thing. That was a really cool set up you did to get that migration to go so smoothly. I’m very impressed with the technical work that you did. I’m impressed you thought through this process in that way.”

I think a lot of appreciation is very effective just in a one-on-one context, not even worrying about big team appreciation.

Audience 5: You mentioned we all want to work on hard problems, fun problems, and maybe direct our team towards those. Often we don’t necessarily have the decision making in where the product goes, where a business wants to go, so what are your strategies for maybe managing upward or convincing them of going towards maybe a more difficult problem but more impactful?

Camille Fournier: I think it depends, so a lot of the times … hard problems is a little bit of a, I don’t think I phrased that as well as I should have. Engineers want to feel like they are having impact, so some engineers are very much driven by solving the hardest problem. I think the best thing you can do in that case is help identify where there are really hard problems and make sure you’re keeping those engineers as close to those as possible.

A lot of the times what you do though as an engineering manager is you also help people find some of the more purely technical problems to solve, and those are not necessarily hard in the theoretical computer science hard way, but they’re often hard in the, “Oh we really need to clean up this particular piece of technical data or this particular system” and you as a manager, are actually explaining the value of spending that technical focus to the rest of the business and saying look, “This is what this is going to enable. This is how this is going to speed us up, or not slow us down in the future.”

And that, I think it’s a matter of really being specific about what the goal in that clean up work is and trying to find measurable things that you can do once you have done that. Some of it’s also just about setting very hard guidelines with “we always spend a certain amount of time on this kind of thing because this is important and this is the way we run our engineering teams.” It’s a combination of those things.

Audience 6: As you become more removed from the day to day delivery of code, do you have any tips for ensuring code quality from your team members?

Camille Fournier: That’s hard. Well, perhaps you can use, a lovely product like Code Climate, a word from our sponsors [laughs]. I do think that letting go actually can be really hard. Some of it is setting standards and being as clear as you can about the standards that you want the software to maintain. That can be anything from someone like me, I’m very passionate about testing, I think testing is really important and so I try to set basic standards like, “Look, we should be very cautious about ever accepting pull requests or whatever that don’t have tests with them. Why isn’t this code tested? Why aren’t we writing tests for this stuff?” I think you can do things like that.

I think also some of it though is about, you hopefully have senior engineers on your team that you’ve trained, that they understand what good code looks like. You want them to be teaching everyone on the team what good code looks like. That is really one of those areas where it’s not really your job as a manager, although you probably still care, but you do want to make sure that senior engineers feel like they have the ability to chime in and say, “Hey, we want to improve the standards in this code. We want to improve the standards in this software, and here’s what we’re going to do to help with that.”

Audience 7: When you first transitioned from coding full time to management, did you experience imposter syndrome and how did you deal with that?

Camille Fournier: I wouldn’t say that it was imposter syndrome exactly. I will say that part of becoming a, especially a senior manager, is developing a certain level of presence and being able to, the body language and the way that you present yourself, and the way that you talk, and the questions that you ask, and the things that you do, are actually important. That’s actually a pretty hard lesson to learn, and so I wouldn’t say that it was exactly imposter syndrome, but there was certainly a level of “why am I not getting the respect that I should get because of my title or whatever” and I think some of that was just, “Oh yeah, I have to learn how to be in a room with my peers and be productive and not undermine people and not be disruptive in certain ways, or make my points in a way that people will hear them and they won’t react negatively. I would say for me, that was the harder lesson than imposter syndrome. I don’t feel like I had too much of that, that’s never been my problem.

Audience 8: Hi. Thanks for speaking with us. Quick question on dealing with promotions, especially as your team size starts to grow. You naturally have to promote people within hopefully, but oftentimes you might find a couple of candidates within your team that when one is a more natural leader, but they both have the same aspirations, how do you generally deal with that? How do you smooth that out?

Camille Fournier: Yeah. I think the best thing that you can do … I think you’re lucky if you know the aspirations. I’ve certainly had people where we did a round of making tech leads, for example, and someone got very upset because they weren’t chosen and it was a shock to everyone involved because nobody had any idea that this person was even interested. And so that was a little bit of a mistake on our part of not actually spending the time to understand what people wanted, to understand people’s aspirations. Part of what you need to do is make sure you understand the aspirations.

Once you understand them, I think then if you think that you’ve got a person who has, frankly, better skills right now, maybe because they just have a natural skill set, that’s okay, but you want to give the other person coaching and try to identify specific opportunities for them to develop some of those skills and to learn some of those things.

Even though they’re not necessarily being promoted to manager, maybe they can be running certain projects. Maybe you can work with the new manager and say, “This person really does want to be in a management role and so we need to be looking for opportunities for them to step up and take some leadership and push themselves out of their comfort zone, maybe give presentations to the team”, whatever those gaps that you think that they might have, giving them a chance to actually practice the job and fill those gaps is a good way to prepare them for when the next opportunity arises. Now they really have the skills and the confidence to do it.

Camille Fournier is a Managing Director and Head of Platform Engineering at Two Sigma. She is the former Chief Technology Officer of Rent The Runway and a former Vice President of Technology at Goldman Sachs.

Fournier earned an undergraduate degree from Carnegie Mellon University and a Master’s degree in Computer Science from the University of Wisconsin–Madison. She is a maintainer of the Apache ZooKeeper open source project, writes the Ask The CTO column for O’Reilly Media, and is a regular public speaker and advocate for greater diversity within technology and leadership. Her book, The Manager’s Path, was published by O’Reilly in early 2017.

In July, we hosted the first annual Code Climate Summit, a one-day conference for leaders of engineering organizations who want to better themselves, their processes, and their teams.

Today we’re sharing The Customer Gap, presented by Code Climate’s Director of Engineering, Gordon Diggs, and Code Climate’s Customer Support Lead, Abby Armada. In this talk, you will hear about how we’ve fostered a positive, productive relationship between customer support and engineering. By creating processes, and encouraging cross-team collaboration, we can combine our strengths to best focus on customers of current and future products.

Transcript of talk

Abby Armada: Before we get into this, I wanted to highlight this customer quote, and following exchange between our customer support and engineering teams. So: “Awesome dedication by the engineering and customer support team. Thanks, Jenna, Abby, and Ashley.” And there’s Jenna, who’s on customer support, saying, “You da best.” And Ashley saying, “No, you da best.” So, you can see this is the kind of vibe your team can have by closing the customer gap.

I’m Abby. I’m the customer support lead here at Code Climate. And including me our awesome team is three people, one being remote. I’ve been at Code Climate for over a year and in various customer-facing roles for about 13 years. I really like running and I really like eat tacos, but not at the same time.

Gordon Diggs: Hi, I’m Gordon. I’m a record collector and I like to cook lasagna. I do sometimes do those two things at the same time. I lead Code Climate’s engineering team and I’m responsible for growing the team in both size, in terms of hiring and, for lack of a better word, “mentality” in terms of our processes and the kinds of ways that we work on things.

Engineering at Code Climate takes up about 40% of the entire company. So, we’re a sizeable department. And Abby and I have actually been discussing and collaborating on the support and engineering relationship for over four years. So we’re really excited to sort of have this culmination of a lot of the stuff that we’ve talked about for so long and share some thoughts with you.

Many companies list customer focus as a core value, but few engineers spend time talking to their customers.

When you think of customer focused companies, you may think of companies like Amazon, where everyone trains in support center and answers calls, or Apple where the CEO regularly works on the support team. And so, many companies list customer focus as a core value. But few engineers spend time actually talking to their customers. So you have the big companies like Amazon and Apple, but many smaller companies that we found also list customer focus as a core value. A lot of people want to do this. They want to be a customer focused company, but it’s really hard and it’s time consuming.

The customer gap: The delta between a stated customer focus and the reality of how engineering spends its time.

And so we coined this term “the customer gap.” We define the customer gap as the delta between the stated customer focus and the reality of how engineering spends its time. Engineering tends to be very separated from our customers. But there are also gaps between your strictly customer-facing departments and your engineering team. If you can close the gap between engineering and those other departments, you can also work to close the customer gap.

Over the years we’ve talked extensively about the gap between customer support and engineering and we think that in order to close that gap, there are things engineering should do, things customer support can do, and things that we should do together.

As a little bit of a visual aid, I made this kind of cheesy chart. But you can sort of see the idea here. You have your customers on the left. You have a small gap between them and your strictly customer-facing departments. And then a wider gap between those departments and your engineering team. And so, one of the things that this shows is that your customer-facing departments are doing a better job of closing the customer gap than you are already, and that’s why they’re closer to the users. And then there’s this larger space between them and the engineering. So, if you can work on closing this gap on the right, then you can really work on closing the greater gap.

Abby Armada: Here’s a brief outline of what we’re going to cover in this talk. We’ll start by talking about ways to build customer empathy within your engineering team. And next, we’ll talk about some examples of processes customer support can implement to work more closely with engineering. And lastly, we’ll talk about closing gaps between engineering and other departments.

Building customer empathy within engineering

Gordon Diggs: Building customer empathy within engineering. This is a really important part of the formula because if your engineers don’t understand your users or their experience, or aren’t bought into this idea of customer empathy and focus, it’ll be a lot harder to close the gap. Ultimately, you really need to get them bought in.

And if I’m being honest, we at Code Climate have this kind of easy. Our customers are software engineers so it’s not a big gap for us, as engineers, to understand our users and their motivations. If we were some kind of printed product, a fashion company, or some kind of feminine care start up, we couldn’t be sure that 100% of our team has something in common with our users and understands them.

So, we can go to conferences, and we can go to meetups, and we can meet people who use our product or who want to use it or who we think should use it because it would really help their workflows. So, this is just a little bit easier for us. But it is also a little bit of a trap. Software engineers are a very diverse group of people and we need to make sure that we don’t project our own biases and assumptions when thinking about our users.

For a few examples: We at Code Climate are a team of Ruby engineers. We work at a small company. We have a good continuous deployment pipeline, and we generally have good coding practices as the nature of the work that we do. But people who buy and use Code Climate come from wildly different perspectives. A lot of them work on very, very large teams, and with tools that we don’t use and understand as well as our own. So while we can get pretty far working with our idea of software engineering, we need to be aware of where that ends and where our customer’s experience starts.

So, it’s really important that customer focus and empathy is a cultural driver. And you need to build that empathy into your engineering culture. It’s not enough to only think about focusing on your customers when things are broken or when your site is down. And so, what does that look like? What does it look like to build empathy into your engineering culture?

First, make your engineers talk to your customers on a regular basis. Include them in customer site visits. Put them on your sales calls. Make them work with support on debugging customer issues. And send them to conferences or meetups or if there’s some kind of trade show that’s relevant to your company, send them to that and put them at the table that you’re sponsoring.

Secondly, we put every mention of Code Climate on Twitter into a Slack channel. So, good and bad, engineers can see what people are saying about Code Climate online. If we ship something and it’s a poor user experience, or the CTA was a really weird color or something and people start complaining about that, we’re going to see it. And similarly, when an engineer ships something that really resonates with a group of users and they start talking about it online, there’s a nice boost there. So, you can kind of get both sides of the coin there.

We also put engineers on the frontline of responding to our community in both our community slack group and on our open source repositories. If you open an issue or a pull request on one of our repos, it doesn’t go to a member of our support team. It goes directly to an engineer who’s responsible for triaging that issue and finding the solution.

Our engineers also run our status page. If our site goes down or our service is in any way degraded, they’re the ones who are responsible for keeping our users up to date about what’s going on. Obviously, they collaborate with marketing and customer support on these updates to make sure that they are of the highest quality that they can be, but ultimately, the timing and the content is up to them.

And lastly, watch your users use the product. One issue that we have as engineers, particularly product engineers is that we know the code that goes into the site and we know that if a page is slow or a user experience is weird, it’s often because the code behind it is complicated. And we bring this bias into using our own product that, “Well, this page is slow because there’s all this nested logic in the templates and stuff.” But your users don’t understand that. They don’t have any of that. And watching them interact with your product, watching the way that they use it, and where they get frustrated, will really help eradicate some of that handwaviness.

So, as with most cultural efforts, building empathy is harder on bigger teams.

Panna actually touched on this a little bit earlier. So, if you can start when your team is small, that’s better. The bigger your team is, the more people you need to convince to buy in to this idea of customer focus and empathy. So, if you’re at a small company, that’s great. You’re in a really prime position to effect change across your team. If you’re at a larger company, all hope is not lost. You can start with a small subset of your team, find a pilot team, and have engineering managers of that team spread their success laterally throughout the organization.

And it’s really important, I really want to mention that it’s not enough to silo this empathy. You can do all you want to build customer focus within your engineering team, but it’s also important to work closely with your support team. And Abby’s going to talk a little bit about some of the ways to do that.

Helping each other

Abby Armada: So, you have to work together. There are a couple of solutions we created here at Code Climate to help both the engineering and support teams be successful at this. These solutions may seem obvious in some ways but the execution and upkeep is essential for it to work well and close the gap, which in turn closes the other gap that exists between engineering and your customers.

The first of these solutions on our side was addressing escalations, which is when a customer’s problem has gone past a scope of troubleshooting and knowledge of the support team and requires a solution from an engineer or someone else. I’m sure many of you here have had to deal with customer escalations in one way or another, and it might have been a thorn in your side. We did a lot of work to improve this process for both of our teams, which ultimately has made our customers way happier.

Our main channel of support is email, then it trickles through to Twitter, Slack, and sometimes GitHub Issues. This is where all of our escalations come from.

So, how did we address escalations before? Engineers worked on escalations on a weekly rotation. This wasn’t ideal for anyone. For the incoming engineer, there wasn’t a lot of context for existing open issues. Plus, it seemed like a giant chore that was an interruption to their regular work. On support’s side, it’s hard to ramp up someone for this work, and it’s especially difficult to form a good working relationship with your new engineer for only a one-week rotation.

We didn’t have a great way of tracking this work, or a consistent process for handing off open issues to the new engineer, or giving enough context for the problems. Prioritizing issues did not exist at all, and we kind of thought they would just figure it out. This led to everyone drowning in a sea of confusion and sadness.

To fix this we came up with a couple of solutions. Instead of a weekly rotation, we now have a dedicated support engineer for a quarter. This solved that problem of feeling like they’re interrupting other work and gives the engineer a chance to fully work and focus on escalations. It also builds a great rapport between engineering and support because we get to know each other for a quarter.

And we broke down our escalations by severity, which gives us an actual prioritization system that makes sense to both teams. There are now four levels of severity, one being the highest and four being the lowest. This isn’t a new concept by any means, but implementing something concrete was the most important part of the solution.

We also documented how to respond to each severity, both as a support person, and as an engineer, and holistically as an organization. This is written in our company handbook so everyone can see and have the knowledge. We also have concrete examples in the doc for easy reference. So, if someone is confused, they can look at the doc examples and know how to assign an issue a severity.

And lastly, we started using a GitHub repo and issues to track and update customer escalations. Everyone in the company already knows how to use GitHub, so implementing this part was the easiest.

This is an example of our severity documentation. You don’t need to read the whole thing – and the people in the back probably can’t anyway – but you can see the structure of how we define severities. In this case, this is a severity three, normal/minor impact. It’s something that’s like a moderate loss of application functionality that doesn’t really affect any of their other workflows. It matches the description. And then the examples live underneath. In this case, a customer reports a bug in an engine that’s kind of broken but doesn’t have any effect anything else that they’re doing. And then the response plan underneath details what both the customer support person and the engineers can do to sort of solve this issue.

Another change is that severity ones are treated differently than other severities within our organization. A severity one is a major issue. So, for example, if a customer’s instance of Code Climate Enterprise is down, we flag it as severity one and it requires all hands on deck to fix.

In past quarters, we found that the burden of solving these types of escalations is hard for a single escalations engineer. They often had to ask for extra help anyway. So we changed severity ones to be treated as production incidents. Support escalates directly to our engineering teams existing PagerDuty rotation. We have a fairly robust alerting pipeline for codeclimate.com, so most issues are caught by other alerts before they even get to support. It was pretty easy for us to integrate these other issues into that rotation. Distributing the work amongst those who are already on call helps solve severity ones more quickly and taps into existing expertise.

After adopting the aforementioned quarterly rotation, it helped highlight gaps in our own team’s knowledge about troubleshooting in other parts of the product. Thus, engineering has started leading proactive education workshops to teach concepts that will help us troubleshoot future issues. For instance, one of our support engineers noticed that we were pretty much escalating every single issue that had to do with our enterprise product. He set up a workshop to talk through troubleshooting concepts and how engineering looks at the same issues. This helped the support team work through more enterprise issues and lessen those types of escalations.

Engineers really benefit from this, too. Having them explain their work and their contributions to the product helps them grow and build empathy, and again, really strengthens that great rapport between your support and engineering teams. And informing the support team empowered us to troubleshoot and triage more effectively and even nipped future escalations in the bud.

Here’s our resolution time for escalations per month. So, after a slight rise due to those new processes, especially proactive education, we were able to have a fast mean time to resolution to customers than before and our customers, obviously, are really happy about that. And here are our escalations per month. You can see the tangible benefits of when we adopted these new processes and it’s because of that quarterly rotation, better processes around triaging, and proactive education. On average, our monthly escalations have gone down month to month, and that’s great.

Having worked on our escalation process, the next thing we did was take a look at the product engineering and support relationship. It’s a common problem that support doesn’t have the full picture of what’s being developed. I hear this all the time from other support professionals that I interact with every day, and this is a problem for everyone.

Even on a small team, communication is oversaturated. There are too many Slack posts and GitHub issues, and this is not sustainable at all. There’s just too much to keep up with. Last quarter, we established a weekly customer support and product meeting to sync up about work being done that week, as well as talk about things coming through the pipeline. Instead of trying to keep up with endless notifications, now we talk face-to-face and it’s much easier.

Personally, this is my favorite meeting I have every week because it’s really productive for my team and the product team, and it really gives my team great perspective on what’s happening in our organization. So, we talk about work in progress. What’s the progress on last week? What’s happening this week? We cover any upcoming releases. We get to answer the question of what exactly are we shipping and when? And how does it affect our customers? Then we talk about any customer-facing communications needed like updating docs, release notes, as well as inquiry response to incoming new customer questions. And lastly, we talk about feature requests. I’ll cover that in a little bit more detail in a bit.

This has helped our teams a lot. I share the most important knowledge back to my team since one of my people is remote, it’s good that we can be all on the same page about what’s happening that week. And it also helps us action any internal work that helps that product work. And it has also stopped confusion about what exactly is being released. We’re more confident and thus can help our customers better. And lastly, it fosters trust, again, between support and product. We know what’s going to be released and how to handle it.

Now that we have that open channel of communication with product and engineering, we decided to tackle the beast; feature requests. We all want to be the type of company that welcomes customer feedback, and feature requests, and actually actions on it. But I think this is the hardest gap to close but we’ve made a lot of steps here at Code Climate to do so.

Before, support had ways to catalog feature requests, but no way to surface them in a meaningful way for people to action them. So, we had a very bad GitHub repo, then a very bad Trello board, and – hey, Gordon, did you look at any of those ever?

Gordon Diggs: Ehhhhhhh…

Abby Armada: Yeah, me neither. There’s a limited process for both of the repos and the Trello board, which also housed bugs alongside feedback. Someone would make an issue, which would live on in perpetuity. And every time a request came up again, someone would comment on it and push it to the top. It sounds good in theory, but no one ever looked at them. Just having the tools isn’t enough. We thought that switching to Trello would solve the problem of stale, sad feature requests. But, in fact, you just needed a process.

The more you can get feedback into the eyeballs of your company, the better. You have to be loud to get this actioned.

We created a feedback repo on GitHub, again, which feeds into a Slack channel, then we talk about important feedback during that product meeting I mentioned before. The more you can get feedback into the eyeballs of your company, the better. You have to be loud to get this actioned.

This is what that GitHub repo looks like. You can see the different issues opened by the people on our team. And we use labels to easily identify the status of each feature request. You can see stuff that’s been actioned, what needs to be reviewed, and the different parts of the site that the feature request is about. And now these are pure feature requests. They are not bugs or anything pertaining to escalations. These are all nice to haves and legitimate product feedback from our customers.

Of note, this repo is completely internal. There’s no way for a customer to directly add feedback to this repo. Only people at Code Climate can do this. And then the feedback is curated by me. We have an issues template that asks a bunch of relevant questions. If the feedback doesn’t clearly answer why a customer is asking for a feature or isn’t detailed enough, it gets rejected. This curation process keeps the board fresh and keeps my finger on the pulse of what our customers want.

This is that Slack channel with that piped in feedback activity. It has all new issues and comments on old issues. And they all get fed into this channel that anyone in our company can join. So, in this screenshot, Jenna opened an issue, pinged Noah to get his thoughts, which he then shared to the issue itself. Loud is good.

As I mentioned, we also talk about the feedback issues in that weekly product and customer support meeting and see if they’re still relevant and see where they fit within our product roadmap. Sometimes feedback and feature requests can alter a product roadmap, giving us ideas for something we didn’t even consider before. And through all of this, we’ve seen an immense improvement in adoption of customer feedback within product development. In fact, after we adopted these processes, 25% of feature requests were actioned by our product team, which is a huge improvement from basically zero.

You’ve heard me talk a lot about what we did at Code Climate to close the gaps between engineering and support, but these solutions might not necessarily work for your specific teams or solve the types of problems you’re facing between your customers, support, and engineering team. As an engineering manager, it’s up to you to try and work in tandem with your support team to solve these problems. Collaboration, communication, and iterating on processes together are the key ways to do this and it leads to happier customers overall.

Closing the gap to other departments

Gordon Diggs: We’ve talked about how to build customer empathy and we’ve talked about some of the processes that support and engineering have worked on together. But what about the other customer-facing departments in our organizations? Your customers move through life cycles, and engineering should follow them.

Before your customers are even your customers, they interact with your marketing and with your marketing team’s efforts. At Code Climate, we dedicated an engineer for a whole quarter to help build automation for our marketing lead pipeline. He did this by supplementing leads with data from a variety of sources and piping it all into our CRM. He learned about what makes leads more qualified from a marketing perspective and our pipeline is fuller and faster than it’s ever been. He also learned a lot about our user personas and our segments. And this ties back to that idea of the diversity of our users from before. He came back from the marketing team with a better understanding of our users and where they come from. Dedicating a full-time engineer to this rather than hiring a contractor or farming out to buying some product, ensures that we built this in the right way and in a way that we can easily maintain and extend moving forward.

Sales is a really important part of most businesses, but particularly at a SaaS product we need to have a sales team. And sales people usually aren’t engineers and may not be able to articulate the same engineering concepts. But they are very good at learning and they can really learn from your engineers. And there are a few ways that engineers can get involved with your sales department.

The first and maybe most obvious of these is building features for customers who are in your sales pipeline. Putting engineers on your sales team means that you can more quickly action the high value projects that will sign customers right away. So, we identified three key features blocking sales and then we built them. And additionally, in just having the conversation about what features are the users that you’re talking to, what features do they really want? In just having that conversation, we clarified our product direction and have a clearer idea of where we need to go.

There’s a very, very important note and caveat to this. Some features will be too big for this setup and some will be in conflict with your existing product roadmap. I’m not suggesting that you give your sales people carte blanche to implement features in your product. But, working through the discussion of the features that they want to build and finding the compromises will really help grow your business. It’ll help clarify your roadmap, and it’ll sign customers, which is really good.

So, another sales engineering activity is reviewing leads technically. This is a little bit specific to Code Climate as a highly technical product, but we have an on-premise enterprise product and we want to be sure that we only deploy it to platforms and customers that will be successful. Doing this once a customer is about to sign a contract causes the sales process to lose momentum, but if you review the technical requirements – for us that’s things like virtualization platform, version control system, programming languages, that kind of stuff – if you review that earlier in the process, your leads will be more successful.

Pulling engineers in to do this on an ad hoc basis was something that we used to do like, “Oh, yeah, just go grab someone off of product to review one of these leads.” But it meant more prep, more interruption, and generally lower quality reviews. So having people on your sales team ready to do those reviews is a really big strength.

Similarly, installing and setting up the product with customers gives engineers a really good sense of what your onboarding experience is like. In many cases, it’s been years since one of your engineers signed up for your product and, most likely, they’ve never done that with money on the line. So, having them sit down and understand what the customer is going through helps them build it better in the future and it helps get the customers up to speed faster. This also ties back to that idea that I was talking about earlier of watching your users use the product. This will really help eradicate some of those unconscious biases that your engineers bring to your onboarding experience.

Lastly, putting customers in touch with your engineers directly build rapport. It’s rare that you can jump on a sales call with a company and there’s an engineer there to tell you about how they built the product, particular features that they really like, that kind of stuff. It’s also rare that you can be in the Slack group and DM an engineer directly to ask them a question about how do I configure this? How do I work with this? And so, having that engineer there really helps build this rapport.

Abby talked extensively about customer support and shared lots of really good thoughts, but I want to throw this department up here because escalations were where we started. Both Abby and I started talking about this customer support engineering thing, and it was the first place that we experimented with this quarterly rotation idea. I also want to mention that being on the support team doesn’t mean just answering escalations and providing technical knowledge to the support team. A successful setup of an engineer on a support team means also building the features that ensures that those customer issues don’t happen again.

So, in the same way that sales engineers build features for customers in the sales pipeline, your support engineers should collaborate with product and engineering to action the features that will really help prevent future issues. So, you can see that drop in escalations per month, and a lot of that is because we found the patterns and where users were running into trouble and where they were writing into support, and built better experiences for them.

What about once someone is a customer but their experience isn’t broken? So, they’re not writing into your support team. Customer success works with customers who are configuring the product, who are discovering how to use it, and who are using it in their workflows everyday. Your engineers can help train users on how to use your product. They can go do customer visits. They can sit down and eat lunch with your users and show off their work or talk about things that are coming up that they’re working on.

I really love training customers, and working with them, and seeing them get excited about a feature that someone on my team built, or seeing them understand a complex part of our system. And if your customers are engineers like ours are, that’s even better because they’re going to want to know what it’s like, what the special sauce behind Code Climate is.

So, in both customer success and sales, the engineers are both training you customers and your representatives about the product. Your representatives may not know about the newest features or what’s in development. And if they do, they may not know about all of the edge-cases or the best applications for these features.

And ultimately, working with customers and with other departments makes your engineers more well-rounded. They’re still going to be great product engineers. They’re not going to stop wanting to build features. It’s fine. But they’re also going to be better at sales. They’re going to be better at support. They’re going to be better at marketing. And this will set them up for success both in your company and in their careers at large. We’re lucky because our quarterly rotation lends itself well to putting engineers on other teams and working directly with other customers.

Engineers also remember their customer interactions. And it informs the way that they build things in the future. They remember seeing that customers missed a CTA or ran into an error because of a configuration problem. And this memory or this interaction lingers with them the next time they build a feature or talk to another customer. And it really informs the way that they go about their work in the future. So, we’ve seen that engineers who do a tour on the customer support team come back to product and have a new way of looking at building product because they’re thinking about customers and they’re focusing on them more. To restate that, more experience with customers leads to better features.

More experience with customers leads to better features.

Engineers don’t like to be interrupted. We’ve talked a lot about building processes to reduce this interruption. Getting into flow is a really important thing for engineers. All the engineers in the room are nodding their heads. And we, as managers, can’t pretend to change that. We’re not going to change flow. We’re not going to solve that problem. But understanding why your support team is bugging you to fix issues and understanding their motivations and that they’re advocating for your users will really help your engineers grow and will make your product more stable.

And I’ll also mention, we made these slides and we did a rehearsal of this talk. And one of my engineers is like, “I don’t like the word nagging on this slide because I think it’s a negative thing.” And it is. It’s only nagging if there’s a problem and if it’s something that they don’t really want to be doing. Talking to support more often, doing these weekly check-ins, having the people there for them to discuss escalations with, will prevent the unnecessary interruptions and it won’t be nagging. It’ll just be talking to you. Support will be talking to you for a reason.

Abby Armada: Support doesn’t like to be interrupted either. We’re doing work too. So having dedicated time to talk to engineers really helps everyone and your customers.

And here’s that visual we presented before except we’ve closed the gap significantly. And our engineers are close to our customers than ever before.

Let’s review some takeaways and what you can do.

Gordon Diggs: Build empathy within your engineering team to foster a focus on your customers. Know where the gaps are between your engineers experience and your customers, and then close them. And start small. If you have a small engineering team, that’s great. Get everyone onboard right away. But if your organization is larger, find a pilot team and then recruit your leaders within engineering to spread their success to others.

Abby Armada: Make sure your processes promote good collaboration between support and engineering. Don’t be afraid to experiment and try new things and talk to each other. You’ll learn a lot about the ways that you can work together and make your customers happier.

Gordon Diggs: Include engineers in every stage of your customers’ life cycle. Find a way. Go to those teams in the strictly customer-facing departments and say, “How can engineering help here?” From marketing to sales to support to customer success, find out where the engineers can help and then put them on the teams for a significant amount of time.

Abby Armada: At the end of the day, if you’re truly customer focused, then happy customers will mean a happy business.

Gordon Diggs: Thank you. Obviously, Abby and I have lots of thoughts on this and we’ve talked about this for a long time. If you have thoughts about any of this stuff, please come talk to us. If these sound like particularly interesting problems to you that you want to help us solve, Code Climate is hiring for both engineering and support roles. So, please come talk to us. And yeah, thank you for coming today.

Abby Armada: Thanks!

Gordon Diggs: Thank you for listening to us.

Gordon is the Director of Engineering at Code Climate. He spends his days managing and growing the engineering team. When he is not at work, he can usually be found at the nearest record store or at home cooking lasagna.

Abby is the Customer Support Lead at Code Climate, and is passionate about great customer experiences. She’s currently working on developing her team, scaling support infrastructure, and finding the perfect taco in New York City.

In July, we hosted the first annual Code Climate Summit, a one-day conference for leaders of engineering organizations who want to better themselves, their processes, and their teams. Starting today, we’re excited to start sharing videos and transcripts of the six great talks. First up is Panna Pavangadkar, then Global Head of Engineering Developer Experience at Bloomberg LP (currently Managing Director at JPMorgan Chase & Co.) with her keynote: Building a developer culture with InnerSource.

Transcript of talk

I’ll just start by introducing a little bit of my background, how I got here, and why I do what I do today.

I run something that we call Developer Experience at Bloomberg. How I got there is a slightly long-winded story so bear with me.

I started off in the ‘90s working as a late night lab assistant in India, which then led me to supporting the manufacturing sector and then the financial sector. When you joined as a consultant, you literally did everything. You were an app developer. You were a system administrator. You were a DBA. You were the person who wired up the cables and got into the machine room and did everything.

That then led me to deciding to follow databases. I became a database consultant and moved to Asia in the financial sector. Long story short: I landed up here in New York City, working in the financial sector again, focusing on application development and databases, and then system engineering, and performance engineering. This long-winded story comes back to why it puts me in this unique position for Developer Experience, as I discovered that – going through these various roles in these various countries, encountering different types of developers – the one thing that I developed a lot for was empathy.

I realized that every single personality type in computer science, varied system administrators, DBAs, app dev, web developers, have their own personality types. We all have our own quirks, our own religion, and do things in a very particular way that’s unique to us. So “it’s my way or the highway” and “I’m god’s gift to mankind”.

That made me develop a lot of empathy that led me to saying, well how can we make our developer experience across the spectrum of people different? Because we all actually want to work with each other. It’s not that we don’t want to work with each other. But we are so myopic in the way that we want to develop our piece of the puzzle, that we don’t see the other person’s point of view.

Two and a half years ago, I got approached by Bloomberg to try and explain how should we be developing software. I had been at Goldman Sach’s for 16 years and done various, various roles. And as a tech fellow at Goldman we were driving technology in a particular way. When I started talking to Bloomberg it was really about how can we continue to embrace change, and keep our developers excited, and continue to develop quality software, and be the product leader that we have been for so long. So we created this team called developer experience.

So basically, my team does anything and everything from owning the tools that are required by the developers, the process, the framework, the training, the documentation. I even got a, this is a real story, I even got asked if we were responsible and we would take care of having enough male bathrooms. But don’t quote me on that one.

Innersource: Leveraging Open Source Best Practices in the Enterprise

Let me make a one second pitch for Bloomberg: Since the majority of people here are from New York City, you’ve obviously heard of Mike Bloomberg. Anybody not heard of Bloomberg the product company? All right. Awesome. So just to make sure we’re all on the same page, we’re a product company based in New York City predominantly, and we’re in the business of providing information. 5,000 engineers across the globe who work on developing the platform on Bloomberg Terminal. You’ve heard of Business Week and you’ve heard of the Bloomberg media news outlets, etc., but our predominant product is the Terminal.

I said we were in the business of providing information. As you can imagine, it’s been 30 years of development that have gone into building the Terminal, to be able to provide very high touch individuals with specialized functions to get the information they need. Whether it’s news, trade related, analysis, portfolio management, to finding out the current events that are happening. So we have to really, really work to provide low latency information and also a broad variety of information.

You can imagine that everyone is working on different functions. Could be for the equities business or it could be for the news media or it could be for some of the back-end functions, just to develop this Terminal itself.

When I got in, what we discovered was that we collaborated a lot. There was a lot of collaboration, but we collaborated the old-fashioned way. Spoke to people. Put in tickets for other people to do things. We were transparent about the fact that your ticket is going to wait for me to finish what I’m working on, or it has to get prioritized by whichever product owner of whichever team I’m working in.

I started exploring the concept of how can we bring open source best practices in house, inside the enterprise. As we started exploring that, we called it “collaboratively sourced” or we called it “internal open source” and finally some of our active developers came up with the fact that hey, this thing already exists in the market. It’s called InnerSource.

Anybody hearing InnerSource for the first time? Cool. It wasn’t a well-known term. We hadn’t heard about it. We were just wanting to bring the best practices in house. After going through a few iterations, we settled on saying fine, we’ll call it InnerSource. Of course, having spent the past 20 years in the industry, my fear was InnerSource would get thought of as developers outside the company working on it. But in any case, supposedly O’Reilly had coined the term 17 years ago, so the term existed.

About 17 or 18 companies, decided to collaborate to see if we could make InnerSource a much more popular term. But more importantly for me, was really bringing those practices in house and sort of breaking down the barriers that exist within an enterprise.

What I discovered is: Most enterprises have grown up organically over the years. It’s very easy in a startup to start with a clean, fresh slate and work on things, and be open about it, be transparent about it, be able to look at each other’s code, etc. In an enterprise that’s evolved over 20 years, you’ve grown up in silos. Thing have got added on as they got added on, so people hold on to their little bit of the codebase. That’s how they’ve grown. What we needed to do was figure out a way of breaking down those barriers and really embracing some of the benefits.

I list out the benefits here – transparency, collaboration, innovation, community, reuse, mentorship, self help – but there are obviously more benefits to open source than these. What I was really focusing on for our developers is collaboration and a lot of the community and the camaraderie that can be built up, so that we have empathy for each other. We are able to work with each other without getting protective about it. That’s pretty much the theme that started it.

How

So how did we go about it? Initially, it was really just talking about the concept. Just like how I asked you, who has heard about InnerSource and a lot of you hadn’t. When I spoke about collaboratively sourced, it was met with of course, a lot of skepticism. There was a lot of critiques. It was like it’s just not going to work. Like, why the hell would we do this? We are already working within our teams. We have enough work to be done within our teams. So the first thing was really about introducing the concept and saying, at least just be open to the idea that I can go across an enterprise team, organizational, artificial boundary and look at somebody else’s code and add value or vice versa. Have somebody else who may have something to offer, may have some sort of expertise, or just be interested in that area, to come and look at my codebase.

Just sharing that idea and getting the excitement created within the development community was the first step that we went about. I did think about, and everybody asked me, what sponsorship do we have? Do we have management buy in? What I had done was just tested the waters, to say, if I go and ask for permission, will it get squashed down or should I push for this collaboration social experiment and beg for forgiveness later?

Fortunately, one of Mike Bloomberg’s business principles state that take the risks and beg for forgiveness if needed. So that’s how we decided to say let’s start getting the developers excited about the fact that hey if you are waiting on somebody to do something for you, you can offer to help them out. In the offering to help them out is where the whole drama lies, but the concept was well understood.

Identify early adopters

Once the concept got understood and a few of the developers started embracing the concept, that’s when we said, let’s identify early adopters. I was in this unique position to say, I own the tools. I own the tools that developers use, so let’s open up these tools and if the next person who asks me for a feature, we’re going to tell them that they can help us and contribute to our codebase and make that happen for themselves.

Two and a half years later it sounds way easier to say what I’m saying. Trust me, all my team leads hated me. Literally hated me. They were like, why is she bringing all this into this? We were functioning just fine, right? Because I mandated that we open up our own codebase.

So I identified early adopters. In your organizations it really is about finding out what’s that sweet spot, what’s the low hanging fruit, which of the less resistant applications, functions, codebases would be able to accept external contributions. Then, it really was about mobilizing people to actually start to engage and contribute.

Engage (at all levels)

This is where we were slightly unique because we already had a few years ago started off with engaging our development community a lot more. We have people who are called partners, we have people who are called champs, we have people who actually within their own areas, are responsible for being the people who engage with the other teams, continue to collaborate with the other teams, as well as pushing best practices. So it was really leveraging this champ/partner community. We have tech reps as well, really embracing and getting them to embrace it and then they started engaging with us to say, can they start contributing to these early repositories because it really was setting precedence.

Evangelize

Once we had the precedence set, because we had a few repositories where people from other teams could now contribute code, we could then start to evangelize a little bit more and even tell middle management, or our managers, or our senior management, that this concept can work. We just have to push the envelope a little bit. So really it was the engagement on all levels and the evangelization.

This is really about tooting your own horn for the project itself. So for InnerSourcing to be accepted, for people to start understanding the terminology, we created an internal function called sauc. It’s just a play on Innersource but it’s called sauc, so when you type in sauc it’s nothing but a list of repositories with pull request, books, help wanted tags, and it’s just a very, very simple gaming methodology. Not to call out people, but to call out projects that have lent themselves to being contributed to as well as extended.

Sponsorship

That’s a key, but in our case, we got sponsorship way later into the game when we had already sort of proved concept, to say this can actually work.

Affecting Change

Organizational structure, culture and dynamics

So I mentioned change is hard. Tell me to walk on the left side of the road when I get out of Penn Station and I go berserk because I have a set pattern. I walk on the right side of the road to get from Penn Station to Park. That’s just a simple example. Try telling any one of you to change the way you write code or change the way you do certain things and you’re going to be questioning why it needs to change because it works for you. The way I develop software on my laptop works for me, why the hell should I change anything, right?

It was really, really hard to get people to accept the fact that now we are going to introduce the ability for other people can contribute to your codebase. You can contribute to other people’s codebase. Keep in mind, I’m talking about history. People at Bloomberg have been around for 20 years. So they have set patterns. They have ways of working. It’s not like we’re getting in or changing 5,000 people overnight. When new people come in, of course they want to be able to bring their new best practices with them. Being able to talk about the fact and getting them comfortable with this organizational structure should not be the barrier which holds you from going across organizational boundaries, which is something that we really had to work on. It was a lot of talking. A lot of sharing stories and convincing people that this is good for them.

There is a lot of pride in the work that we bring, the work that we have done. Sure, I took some short cuts at some point in time, but I had pride then and now, because I don’t want to feel exposed, I’m reluctant to open it up and allow people to critique it or comment on it.

So, code pride is one of the things that I found was the biggest road block because people have evolved over time and they have become better, they have embraced new things, so if you go back and open up something that somebody wrote 15 years ago, and start saying this person doesn’t know what the hell he was writing about. Yeah, maybe he didn’t. Maybe he or she had no clue what they were doing at that point in time, but they have evolved now.

What became really interesting is creating a culture where it was okay to talk about code that was written earlier, but it was not okay to say nasty things. It’s easier said than done.

We use IB, Instant Bloomberg, as our internal chat. I can’t police multiple chat rooms to say people shouldn’t say nasty things to each other. I’m guilty of saying, this is just ridiculous stuff, I’m not even going to bother commenting on it or they shouldn’t have done it this way, but we had to start creating cultural awareness that you cannot bite somebody else’s head off, you cannot be nasty, and creating the informal policing.

I talked about champs. I talked about tech reps, I talked about evangelists. Creating that culture where developers feel that they can hold accountable other people who may be getting vicious, or even slightly aggressive, on IB or mail or even comments in the codebase itself. Really embracing the fact that you’re coming from different places and you’re contributing at different times and therefore, passing a judgment is not acceptable, and we have to find more constructive ways of changing that codebase and making that change.

Accepting contributions is hard work

As soon as we started getting over that barrier, the next thing was, well, accepting contributions is hard work. And then taking ownership of somebody else’s contribution, because I may still own the product and I’m responsible for when the tool breaks. It then became the concept of saying, well we have to then define how am I going to discuss the feature request coming in, or how am I going to deal with the idea, the suggestion, the code contribution coming in, and what are the rules of engagement? What are my guidelines? Or, what’s my point of entry? And what are we willing to engage with and what are we not willing to engage with.

Now, in the whole Agile transformation, it’s tough because you need the product owners to buy in, you need the team to buy in, you need to be able to set aside the time to accept contributions that weren’t part of your regular stream of work coming in.

Trusted committers

This is where we started to talk about expanding our trusted committers beyond the organizational or product team. Could we grow our list of trusted committers beyond the organizational boundaries? This was really, really hard work. It of course meant that there was a lot more coaching involved. There is a lot more shadowing involved. A lot more people who are getting familiar with your codebase, before they can actually help out with code reviews, by being able to review your pull request, etc.

Challenges

Risk

It’s complicated. There is a lot of risk to it and the risk is if I’m owning a production function and you’ve contributed code to it, and something breaks, I’m going to be held accountable for it. I’m going to have to support it. I’m going to have to get up at night and deal with whatever broke because you didn’t test some edge condition. It’s easier just to say no we can’t do this. So that risk was the biggest one that we had to overcome, to start to encourage a higher standard of acceptance such that we could take this risk of getting contributions from other people.

Commitment

The next one is commitment, both time and team.

Time is the easier one because – and I got into trouble for saying this in Europe, but – everyone does 120%. Some people even do 140%. It is basically going beyond your day job and providing some contributions to other teams or even functions you’re interested in, but Europe has some very strict guidelines around the 80/20 and just padding 100% of the time that they work on, so I was told to work on trying to figure out how we could adjust our external or additional contributions to within 100%.

So we went back to this concept of 80/20, 90/10, call it what you want. We didn’t really advertise it internally, but we took a few teams and said, let’s try it out, to see how much does our work really suffer, if we do set aside 10% of our time to work with other teams or things that we may be interested in personally. The product buy-in on this was really, really tough, as well as some of the teams just didn’t embrace it initially.

I won’t say this was a solved problem, but we continue to work on it and I truly believe persistence is going to pay off. Over time, both project owners as well as the teams will realize that having that 10% flexible time for me to work with other projects that I’m maybe interested in, is actually a motivating factor for me because I don’t mind the drudgery stuff I may be doing or I don’t mind some of the other things that may come on my plate, because I have that 10% excitement of what I want to do. Or try out a new thing. Or be able to look at a new exciting project that’s going on in some other part of the firm and be able to do that.

It also led to this whole confusion between projects and products and projects done by teams versus what the product ownership is. The reason I bring that up is, even though the Terminal is one big product, we have multiple products within the Terminal, and then we have multiple projects that go across multiple products – so there’s no one size fits all. So we would have to figure out what the right distribution of work across projects and products is. As I said, in an enterprise having evolved over time, time accounting or people accounting became a question, to say, where does a developer’s time go?

Again, we went back and forth on this, saying we shouldn’t worry about where a developers time goes, we should worry about the progress that we’re making with moving the product forward or the project forward, and the innovation that we’re bringing in, the new functionality that we’re bringing in, which is what our higher end clients need.

That is again a lot of proving by actually getting some initial teams to be able to participate in this sharing concept, move the product forward, and getting the product owners to actually talk about the wins. We had some crazy user stories being shared internally about just functional changes that we were able to move forward much faster because multiple teams were now able to collaborate at a completely different level.

Rules of Engagement

I spoke about rules of engagement. I spoke about people defining, so we didn’t set a one size fits all. We didn’t say this is the participation criteria across the board, we said, every team can now put in a contributing.md and I said team but I really mean a repository. Any repository, you can define your rules of engagement. You must have a contributing.md otherwise you’ll get a default one. And in that, your rules of engagement and your acceptance criteria for contributions. Then what we started doing was scraping all the repositories to find these contributing.md’s as well as started to showcase where people were being forthcoming about defining their rules of engagement really well and their acceptance criteria as well as where it was then possible for others to start contributing to it.

Buy in

I already spoke about the buy in. We had to get and we cheated again a little bit on this, we went around the product owners and found out which product owners would lend themselves to this concept of inner sourcing, who would lend themselves to saying, some portion of my time, 5%, 10% of my developer time, can be spent and we had various sort of negotiations with them which is to say, fine, I can move tickets in some other project as long as it helps my project move forward. If I’m waiting on somebody, I have the leeway to contribute to that particular project and move it forward for myself.

So we engaged with some of the earlier product owners. Once we had gone through six months with them, we got them to talk to other product owners and showcase how it was beneficial – not just in terms of moving the product forward, but in terms of the developers engaging with the other development teams on a much deeper level. We were engaging and collaborating at the codebase.

It also helped with keeping us motivated, and having options. I now like what’s happening in the other team, and I have mobility options to actually move to the other team and help them move things forward. We had various occasions where somebody moved to another team for six months, helped the move a particular area forward and then move back. It just opened up a variety of avenues for us.

It’s my baby

Finally breaking the myth about it’s my baby. How many of you still hold onto stuff saying that it’s your baby? I used to be one of those people 10 years ago. You have to learn to let go. Literally, it’s not going to get better continuing to be your baby, right? At some point of time, even parents let their kids go. So, the breaking down that concept of “this is my baby and I’m not going to let go” was probably the toughest one. So we had to continue to push on those people who thought it was their baby and work with them on an individual one on one basis. I will claim we still have a few. I think we’ve broken down most people to at least open the doors. They still think it’s their baby but they’ve opened the doors. We still have a few more to go and that’s been the toughest one.

Diversity

Individuals

I started my talk with what got me to this place which is I had experiences across Asia. So in India, it’s a very hierarchal society. It’s changing, so don’t throw darts at me right now, this was 20 years ago. We had just started. The computer boom had just started in the mid 90s and it’s very hierarchal. You get delivered a set of tasks. You move forward. Nothing. You’re not allowed to question or offer a suggestion.

Unfortunately, I was sort of badly placed there. I was born and brought up in India, but I was badly placed there because my dad sort of encouraged us to really do whatever the hell we wanted. We were two girls. When I started working, it was really tough for me to hold back because if I didn’t agree with something, I would say, this is just wrong. I’m not going to write it this way. That was my individual experience. However, I discovered – as I moved into system administration and database administration, I was one of 50 to 100 guys sitting there – I was okay working with them because I had grown up that way. But the other girls that started joining our teams, were not okay with it. They found it difficult. That’s when my head started clicking and I said every single individual is different. I could deal with it but some of the other aren’t dealing with it.

Then I discovered that it’s not a gender thing. It’s individuals. They are individuals who are soft spoken. There are individuals who don’t mind putting their ideas out there. There are individuals who are more thoughtful. There are individuals who will speak off the cuff and we have to account for those individuals, for those different individual traits when we start collaborating and we have to try to create a practice where everybody is sort of self-policing themselves so that we are more inclusive. That’s something that just doesn’t come naturally. But we had to start talking about it and as I held more and more intimate 20 people, 30 people sessions on pointing out behaviors within instant messaging, pointing out behaviors with updates on tickets, pointing out behaviors with code reviews that were nasty, or appear to be nasty. I am a direct person. I can ask a direct question. I didn’t think twice about it. But the person on the other end or a newcomer on the other end, may perceive it as hey I’m not going to touch this thing because the next thing I do my head is going to get bitten off and I just don’t have time to engage with it.

That really is something that each one of you, individually, if you’re just conscious about the fact that the other person might be coming from a different place, we can collectively improve the developer culture across the board. Just by being conscious of the fact that somebody is coming from a different place and may have a different criteria in mind.

(By the way the picture up there is a fish tank at Bloomberg and I always get fascinated because every fish behaves differently and that’s why I wanted to put that picture in there.)

Building a culture of mentoring/coaching

Building that culture of mentoring, of coaching, is every individual’s responsibility, and just making people conscious, all developers conscious, of the fact that this is what’s happening. I found a very unique way to do it. Get a bunch of people in the room, of varying experience and at different levels in the organization. So two years’ experience to 20 years of experience and ask very provoking questions on how they would react to a certain statement out there or how they felt when something happened in IB and instant messaging or what would they think if they had a newbie question to ask. Who would they ask that question to? How would another person who was sitting there react to that newbie question?

When we started having these conversations, it was very interesting because people discovered, just observing and hearing other stories in the room, behaviors that they probably needed to change themselves. It wasn’t anybody judging it was just sharing stories. And we still do that to bring developers together even in meetups, we ask those questions, especially around being more inclusive, about the varying range we have.

Community driven

As I said, it’s all community driven. We leverage the champs, the partners, the SI partners a lot. I encourage developers to be their own police so we don’t have top down mandate. We don’t have a management decree coming down that thou shall do this. It is all based on grass roots efforts. We do have support now though.

Teamwork

Of course, it’s not, even though we are all individuals and every single individual contributes to it, nothing moves forward without us moving as a team including this collective developer audience as a team.

[Indicates slide outlining roles within team and a picture of a dog sled race team] The reason I very specifically picked this sled racing team is to point out the very, very simple difference. They are not all eight equal dogs. Each dog has its own personality. If they are trained, they are trained for the position they are running at. So the leader dogs versus the end dogs, have very different roles to play and part of the training goes into training those dogs that way. Those dogs don’t behave out of their roles. They behave in their roles.

I don’t mean to compare us to a sled dog team, but the reason I point this out is because when we’re functioning in a team, you will realize that and you probably already know this, that everybody plays a different role, apart from the official role. So some are more mentors. Some are more coaches. Some can ask more questions. Some are more outspoken and will take over the meeting or take over the design discussion and it’s their way or the highway.

What I’m really asking for in this is the roles should be really determined for the team as to who is doing what, but we should really embrace the differences and ask people – or make people comfortable – to participate in the team, even though the roles are clearly defined. Where people take over meetings or where people may be bullish about something, find somebody to coach them, mentor them, to change that behavior so that the team itself can evolve and become a better team.

Tools

When I go back two and a half years, I said okay, what are our silos? Why are we so siloed? Where is the collaboration happening? We didn’t have the appropriate tools. Tools did play an important role. Repositories were permissioned individually. I won’t even go back to whether we were using CDS, Purecase, SVN. Earlier versions of Git. We are now on Git but the reason I bring that up is because repositories are individually permissioned traditionally. That’s how we grew up in silos. So the first thing we did was say, okay, we’re going to open up our repositories.

“Oh no, no, no. You can’t open up my repository because I have sensitive stuff there.” What sensitive stuff? “Oh we store passwords there.” I’m like that’s not sensitive stuff. Take your passwords out. The repo is not the right place to store the password and keep a closed repository. This is a true story by the way. But it always came up as “oh we have sensitive code. We cannot open it up.” As I started questioning what is the sensitivity of that code, it always boiled down to one of three reasons. Three invalid reasons and I’ll tell you the one valid reason.

“I have some secure stuff there that I shouldn’t have put there but I put it there so therefore I can’t open it up beyond my team.”

“I have some…” am I allowed to say shitty code? “I have some really badly written stuff here. We’ve made some bad decisions. We have to clean it up before we can open it up. So we’ll clean it up and then we’ll open it up.” Of course it’s never going to get there.

And last but not the least is “oh, because these are low level APIs and we don’t want them to know what we’re doing and be able to leverage some of the other stuff, we can’t open it up because they can’t see the decisions we’re making because then they’ll directly access our codebase.”

The one valid reason which is probably true across the industry is 10% or 20% of the codebase probably was truly specific to competitive business advantage, maybe some algorithms. Maybe some business logic, etc. Right? That was the key, the glue, the thing that sold your product. 10%, 20% and this is just an off the cuff number.

The minute we said that all repositories are open by default, we started working through these restrictions that were laid out to us and we started just saying, you’ve got to open a repository by default. If you want to close it up, you’ve got to talk to me. Then of course I’ll wear you down with asking you questions and then I’ll take you to your CIO and wear you down with asking questions.

That was our first thing. We were pretty scared and skeptical that because of this rule, we would not get people moving into this concept, but as I go back to how I started my conversation with the early adopters, with the evangelist that we created, with the buzz that got created about having a tool set that actually works, we started getting people moving their codebases over from whichever legacy repository they sat on. And we started getting more and more requests for features such that the tools would enable them to embrace this change.

Agile brought in some rules. So our Agile coaches came with some very specific guidelines. We had to then coach our coaches on some of the ‘religion’ that they brought in versus some of the common sense which is just we needed to work with within our enterprise because our enterprise had grown up that way. Just to get them to recognize the differences and work with us was a challenge, but it’s something we worked through.

What we also discovered was thinking outside the box. In a traditional enterprise company, we didn’t have hackathons. We didn’t have coding days. We didn’t have space for ideation. So we started sponsoring a lot of those kind of activities. We have something called a Dev-X hack a thon which runs for a couple of days. We have it two or three times a year. We have it in London and we have it in New York. We do other cool stuff. The swag, the prizes, but the fact is that the ideas that come out of Dev-X hackathon get sponsored to get built up as a project.

So a lot of the tools integrations that we built up, were a result of the hack a thons. The idea started in a hackathon and then got sponsored and we could go ahead and build out that integration, amongst the other various SELC tools.

Encouraging Collaboration With Stretch Projects

We found this to be a really, really interesting way of encouraging collaboration across teams. All the newcomers or the new classes that come in, I always encourage them, as part of their training to take on stretch projects. If they are interested in taking on a stretch project, I encourage people to work with their management teams to allow them to do those stretch projects. That seems to have helped us in moving the agenda forward because as people start to see the benefits both for the people that are working in their teams as well as the projects that they are working on, everybody has got a win, win situation.

What we also started to do was say, if I have opened up my repository, I’m going to have some issues being tracked and I can put in help wanted tags on the issues that are low hanging fruit for me and I can get others to contribute to them. I mentioned this function called sauc. You run sauc, you get to see a list of repositories which have help wanted functions. For somebody who doesn’t know specifically where they want to get started, or they may have an idea they can just go look at the help wanted issues, pick them up, and work on those. This was a really easy way for us to say, do it yourself. Self-serve yourself for moving something forward.

What we also did was shared infrastructure projects. Everything with software infrastructure which was related to the tools we opened it up. Some places it’s harder to accept contributions especially when it’s really related to compiler flags which go across the entire stack, so those are harder contributions to accept. But some of the simpler contributions are really straightforward. We also started to understand common pain points that came across because as you can imagine, we’ve opened up a codebase now. So I can look across my entire sauc repository and see everybody’s projects. If I have somebody working on containers, I can see who else is working on containers and create those opportunities to pull them together so that we don’t have everybody doing their own thing. And pull those projects together and actually sponsor it as a project so we can collectively work on that one functionality or feature or piece of infrastructure that we’re developing.

And with that, I’m going to say and encourage all of you to get started. You can look at innersourcecomments.org. I have references at the end and the three things, I called it my three pronged approach initially when I started, which is identify the early adopters, evangelize, and then get the sponsorship. I hope this has been useful for you.

Panna Pavangadkar is the former Global Head of Developer Experience for Bloomberg’s Engineering group and currently Managing Director at JPMorgan Chase & Co. Building a great developer experience is at the heart of what her team does, providing a development environment that enables application developers to focus on building the company’s core product: the Bloomberg terminal. Her past experience with databases, operating systems, infrastructure and application development in various engineering roles – as Technical Fellow, Vice President at Goldman Sachs (New York) and JP Morgan (Singapore) and NIIT (Pune, India) – gives her a unique perspective to understand and work to introduce and encourage wide scale change within the company’s developer and engineering communities.

Businesses want high quality codebases and developers want to write high quality code – but what does that really mean? How can you tell if your code is high quality?

Search for a single definition of software quality and you’ll see that it is open to considerable, and sometimes heated, debate. Aside from matters of taste, this is because code quality can’t be defined by a single attribute, but rather through a combination of traits. So how do you identify them?

Over the years, as we’ve talked with customers about what they’re trying to achieve with a code quality solution, the same eight traits keep coming up:

☐ Clear

Can the code be read, understood, and maintained over time, by someone who isn’t the code’s original author. Martin Fowler, an authority on code quality, stated this well: “Any fool can write code that a computer can understand. Good programmers write code that humans can understand.”1

☐ Simple

Elegant code that does exactly what is needed and nothing more, sometimes described as “the simplest thing that could possibly work”.

☐ Well-tested

Code is written to achieve a purpose, and testing – either with unit tests or integration tests or both – is the best way to determine if it achieves that purpose and works with the rest of a codebase. Of course, just having lots of tests doesn’t mean code is “well-tested”. The tests themselves must be concise, readable, and comprehensive.

☐ Bug-free

A raincoat that doesn’t keep out water isn’t high quality. For the same reason, the presence of bugs preventing desired behavior is a common marker of low-quality code.

☐ Refactored

Refactored code is code that is not just written once and committed, but iterated on to match best practices and the team’s conventions.

☐ Documented

As with clarity, documentation – inside the code or external – is highly regarded because it supports long-term maintainability.

☐ Extensible

In a business environment, codebases are constantly evolving to meet new requirements. Code that is extensible is prized for its ability to enable developers to rapidly add new features without having to spend a lot of time on maintenance.

☐ Performant

For businesses delivering a service where speed is paramount – say, e-commerce platforms – code is unlikely to be considered high quality unless it’s performant.

Any combination of these can make for great quality code depending on what’s important to your business. The difficulty is deciding what that is as a team.

Perhaps initial time to market is your core business priority – if so, you may not be as concerned about test coverage, and that’s okay.

The important thing is to make sure that everyone contributing to your codebase is on the same page, and the goals for your business and your code are aligned. If not, you risk moving in different directions and not achieving either.

Next time we’ll take a look at how to choose the right complexity metric for your team.

Today we’re excited to announce that Code Climate has raised $4.5M in Series A funding from Union Square Ventures (USV) and existing investors NextView Ventures, Lerer Hippeau Ventures, Trinity Ventures and Fuel Capital. Albert Wenger, Managing Partner at USV, is joining our board, and we’re excited to join USV’s portfolio of companies, which includes MongoDB, Twilio, Etsy, and others.

This is a major milestone for us, and we’re excited about what it means for the over 80,000 developers who use Code Climate to build and ship better software. We have a big vision for the future:

Empowering every software developer to improve the quality of their code and the outcomes of their projects with the most advanced, open and extensible platform for source code analytics.

Since our seed funding round in summer of 2014, we’ve introduced an open and extensible static analysis platform, shipped a major new edition of our on-premises product, and launched a powerful browser extension that brings code quality and test coverage information directly into the GitHub user interface.

We’ve grown to provide analysis for more than 90,000 repositories across 20+ programming languages and frameworks, and analyze two billion lines of code each day – making us the largest provider of cloud-based static analysis.

Here’s what our new investors had to say:

There is a common mantra that you can have any two in software: fast time to market, low cost of development, or high quality, but never all three. This, of course, is also what people used to believe about manufacturing before the rise of techniques such as lean manufacturing and continuous improvement. When you lead with quality in manufacturing you can, in fact, have quality, speed, and low cost. The same will be true for code, which makes assessing and managing the quality of code a key challenge for the coming years. - Albert Wenger, Union Square Ventures

We completely agree, and we’re thrilled to have the resources to accelerate our work on this problem for years to come. To that end, we’d like to share a little about the next big thing in the works…

Coming soon: A new, open source edition of Code Climate

We’re working on an open source, standalone edition of the Code Climate application, which you’ll be able to download and run anywhere – including behind your firewall – completely free. We’re calling it Code Climate Community Edition (CE) for now and expect to ship an alpha version within a month.

It should come as no surprise that we’re huge fans of open source. We’ve long provided free service to open source projects, and last year we open sourced our static analysis engines and a command line interface (CLI) when we launched our open, extensible platform. We see providing a workflow-integrated code analytics experience as an open source package as the next big step in making Code Climate a ubiquitous part of every software developer’s toolbox, and hope you’re as excited about it as we are.

Great companies like GitLab and Travis CI have built thriving business around open source (or “open core”) offerings, and we thank them for their inspiration and innovation in these areas.

Since it will be possible to run the community edition of Code Climate for free, you may wonder what our plans are for revenue. In short, they don’t change much. We’ll continue to provide our cloud-based product at CodeClimate.com (still free for open source projects!) where we host and manage everything for you and keep things running smoothly. We’ll also continue to offer an “enterprise” edition of Code Climate for on-premises installs, with exclusive features and services focused on larger teams. We’ll have more to share when we release the Community Edition alpha.

We believe that every developer and every project can benefit from Code Climate from day one, and are happy to make that even easier for more organizations, regardless of their requirements for where they store their source code.

 Never Miss an Update

Get the latest insights on developer productivity and engineering excellence delivered to your inbox.