lib/tasks/resque.rake
# frozen_string_literal: true
require 'resque/tasks'
require 'resque/scheduler/tasks'
namespace :resque do
task :setup do
require 'resque'
end
task setup_schedule: :setup do
require 'resque-scheduler'
# If you want to be able to dynamically change the schedule,
# uncomment this line. A dynamic schedule can be updated via the
# Resque::Scheduler.set_schedule (and remove_schedule) methods.
# When dynamic is set to true, the scheduler process looks for
# schedule changes and applies them on the fly.
# Note: This feature is only available in >=2.0.0.
Resque::Scheduler.dynamic = true
# If your schedule already has +queue+ set for each job, you don't
# need to require your jobs. This can be an advantage since it's
# less code that resque-scheduler needs to know about. But in a small
# project, it's usually easier to just include you job classes here.
# So, something like this:
# require 'jobs'
end
task scheduler: :setup_schedule
end